I started drawing the CAD model last night, i'm not real fast with 3d yet and i'm doing it in my spare time so its not going to be a fast project.
I quoted material and estimated time per piece and i'm looking at about 80 bucks a set for them. I didn't see what the last ones went for so i'm trying to gauge interest, is that going to be to high?
I quoted material and estimated time per piece and i'm looking at about 80 bucks a set for them. I didn't see what the last ones went for so i'm trying to gauge interest, is that going to be to high?